WIPIVERSE All articles

Belarusian Railway BCG-1

The Belarusian Railway BCG-1 (originally designated BKG-1; from Russian: БКГ — Белорусско-Китайский Грузовой, meaning "Belarusian-Chinese Freight") is a class of twin-unit, eight-axle, high-power mainline electric freight locomotives used by the Belarusian Railway (BCh). It operates on the 1,520 mm (4 ft 11+27⁄32 in) broad-gauge network under 25 kV 50 Hz AC overhead catenary.

History

In April 2010, CNR Datong Electric Locomotive announced a 700 million Yuan (~$84.9 million) contract to supply 12 twin-section electric locomotives to Belarus. The contract was signed in October 2010 and funded via a loan from the Exim Bank of China to ОАО «Беларусбанк». The locomotives were intended to increase haulage capacity from the 4,700–5,500 tonnes range of the older VL80S locomotives to 7,500 tonnes or more.

Construction of the first vehicle began in August 2011 and was completed in December 2011. The first two units arrived in Belarus in May 2012 at the Baranovichi locomotive depot. A second batch of four locomotives (numbers 003–006) arrived on November 24, 2012. A total of 12 units were produced.

Design

The BCG-1 is derived from the China Railways HXD2 locomotive type, which itself was developed from the Alstom Prima locomotive platform. Each locomotive consists of two permanently coupled four-axle sections, giving a (Bo'Bo')-(Bo'Bo') wheel arrangement.

Key specifications:

Parameter Value
Configuration (Bo'Bo')-(Bo'Bo')
Gauge 1,520 mm (4 ft 11+27⁄32 in)
Power system 25 kV 50 Hz AC
Power output 9.6 MW
Maximum speed 120 km/h (75 mph)
Axle load 25 tonnes
Tractive effort 760 kN

Major suppliers included Bombardier (CPC propulsion systems), Knorr-Bremse (braking equipment), and ABB Datong Traction Transformers (transformers).

Operators

The sole operator is the Belarusian Railway (БЧ / БелЖД), which is the fully state-owned railway company of Belarus.

Browse

More topics to explore

    Browse all articles