Battersea Power Station tube station is a planned London Underground station on the Northern line, forming the southern terminus of the Northern line extension (NLE) from Kennington. The station will be situated adjacent to the historic Battersea Power Station complex in the London Borough of Wandsworth, on the north side of the River Thames.
Key facts
| Attribute | Details |
|---|---|
| Line | Northern line (extension) |
| Location | Battersea Power Station site, Wandsworth, London, England |
| Coordinates | Approximately 51.4825° N, 0.2164° W |
| Structure | Underground station with island platform configuration |
| Platforms | Two platforms serving a single pair of tracks |
| Accessibility | Designed to provide step‑free access via lifts and ramps |
| Operator | Transport for London (TfL) |
| Construction start | 2020 (site preparation and tunnelling) |
| Planned opening | Currently scheduled for 2025, subject to construction progress and regulatory approvals |
| Design | The station design incorporates elements intended to complement the Art Deco aesthetic of the neighboring power‑station building; entrances are to be integrated with the redevelopment of the surrounding area. |
| Connections | Surface connections will include local bus routes and pedestrian links to the Battersea Power Station redevelopment, including residential, commercial and cultural spaces. |
Background
The Northern line extension, approved by the UK government in 2015, adds approximately 2.6 km (1.6 mi) of twin‑track tunnels from Kennington to Battersea. The extension comprises three new stations: Nine Elms, Featherstone Road (later renamed as “Battersea Power Station” in planning documents), and the terminus at Battersea Power Station. The project aims to improve public‑transport access to the rapidly redeveloping Battersea area and to support anticipated new housing and employment opportunities.
Construction
Excavation work for the station box and associated tunnels began in 2020, employing a combination of tunnel boring machines (TBMs) and conventional cut‑and‑cover methods where surface access was feasible. As of the latest available reports, the main structural works of the station box have been completed, and fit‑out works—including platform finishes, mechanical and electrical services, and installation of ticket‑gating equipment—are underway.
Operational expectations
Upon opening, Battersea Power Station tube station is expected to provide a direct underground link between central London and the southwest of the city, reducing journey times to the city centre to under 15 minutes. Service patterns are projected to include a regular Northern line service with a peak‑hour frequency of 5–6 trains per hour, subject to operational planning by TfL.
References
- Transport for London (TfL), “Northern Line Extension – Project Overview,” 2023.
- Department for Transport, “Northern Line Extension – Business Case,” 2015.
- London Borough of Wandsworth, “Battersea Power Station Development – Transport Infrastructure,” 2022.
Note: Information reflects publicly released data up to 2023; subsequent developments may affect dates or technical specifications.