Batong line (Chinese: 北京地铁八通线; pinyin: Běijīng dìtiě Bātōng xiàn) is an east–west rapid transit line of the Beijing Subway system. It extends Line 1 further east from Sihui in Chaoyang District to Universal Resort in Tongzhou District, Beijing, China.
Name Origin
The name "Batong" is derived by combining the first character of Bawangfen (八王坟), another name for Sihui, and Tongzhou (通州), the eastern suburban district of Beijing which the line serves.
Overview
- Other names: M1 East (planned name), Line 1 East, Line BT
- Status: Operational
- Locale: Tongzhou and Chaoyang districts, Beijing
- Termini: Sihui (west) – Universal Resort (east)
- Stations: 15
- Type: Rapid transit
- System: Beijing Subway
- Operator: Beijing Mass Transit Railway Operation Corporation Limited
- Depot(s): Sihui, Tuqiao
- Rolling stock: 6-car Type B (SFM01, SFM02, SFM07, BDK06)
- Line length: 23.4 km (14.5 mi)
- Character: Elevated, at-grade, underground
- Track gauge: 1,435 mm (4 ft 8½ in) standard gauge
- Electrification: Third rail 750 V DC
History
- December 27, 2003: Phase I opened (Sihui to Tuqiao), covering 18.964 km with 13 stations.
- December 28, 2019: Southern extension (Phase 2) opened from Tuqiao to Huazhuang (4.5 km).
- August 26, 2021: Universal Resort station opened.
- August 29, 2021: Through operation with Line 1 began, allowing passengers to travel directly between the two lines without transferring at Sihui or Sihuidong.
Route
The Batong Line follows the Beijing-Tongzhou Expressway eastward from Sihui to Guǎnzhuang. Between Gaobeidian and Guǎnzhuang, the line and its stations are built into the highway's median. At Bali Qiao, the line turns southeast and follows Jingtang Road to Tu Qiao. The southernmost section turns south along the 6th Ring Road to Huazhuang and Universal Resort. The line is mainly above ground, with only a 3.8 km underground section.
Through Operation with Line 1
Although proposals for through operation between Line 1 and the Batong Line were made as early as 2010, the two lines initially operated separately due to incompatible signaling systems. Through operation was approved by the Beijing Development and Reform Commission on June 12, 2020, and officially commenced on August 29, 2021.