WIPIVERSE All articles

Alto Lindoso Dam

The Alto Lindoso Dam (Portuguese: Barragem do Alto Lindoso) is a concrete‑face rock‑fill dam on the Lima River in the municipality of Ponte da Barca, Viana do Castelo District, northern Portugal.

Key characteristics

Attribute Details
River Lima (Rio Lima)
Location Ponte da Barca, Viana do Castelo, Portugal (coordinates approx. 41°58′N 8°17′W)
Type Concrete‑face rock‑fill dam (CFRD)
Height 110 m (≈ 361 ft)
Length (crest) 340 m (≈ 1,115 ft)
Reservoir name Alto Lindoso Reservoir
Total storage capacity ≈ 82 million m³ (≈ 27 billion US gal)
Surface area (full supply) ≈ 3.5 km²
Hydroelectric plant 2 × 22 MW Francis turbines (total installed capacity ≈ 44 MW)
Annual generation About 150 GWh (average)
Primary purposes – Hydroelectric power production
– Water supply for irrigation and domestic use
– Flood mitigation
Construction period 1989 – 1992
Operator EDP (​Energias de Portugal) / Portuguese water‑resource authority (Águas de Portugal)

History and purpose

The dam was built as part of Portugal’s late‑20th‑century effort to expand renewable energy capacity and improve water‑resource management in the Minho region. Construction began in 1989 and the reservoir began filling in 1992, after which the hydroelectric plant entered commercial operation.

The Alto Lindoso Reservoir serves multiple functions: it provides a regulated flow for downstream water users, contributes to regional flood control, and supplies water for agricultural irrigation. The hydroelectric component supplies electricity to the national grid, supporting Portugal’s renewable‑energy targets.

Design and operation

As a CFRD, the dam consists of a rock‑fill embankment with an impermeable concrete slab on its upstream face. This design was chosen for the site’s steep valley walls and the availability of suitable rock material locally. The spillway, located on the dam’s left abutment, is an uncontrolled overflow type capable of discharging the design flood flow safely.

The power station is situated at the dam’s toe, housing two Francis turbines. Water is conveyed from the reservoir through penstocks to the turbines, where it drives generators rated at 22 MW each. The plant operates primarily as a peaking facility, adjusting output to match electricity demand.

Environmental and social aspects

The creation of the reservoir submerged a portion of the surrounding forested valley, leading to the relocation of a small number of residents and the loss of some agricultural land. Environmental monitoring programs have been implemented to assess impacts on local biodiversity, water quality, and fish migration. Management measures, such as seasonal flow releases, aim to mitigate downstream ecological effects.

References

  • Portuguese Ministry of Environment – “Dams and Reservoirs – National Inventory” (2020)
  • EDP – “Hydro Power Portfolio – Alto Lindoso” (company technical sheet)
  • Agência Portuguesa do Ambiente – “Water Resources Management – Alto Lindoso Reservoir” (annual report)
Browse

More topics to explore

    Browse all articles