The 2024 Estlink 2 incident refers to a major fault and subsequent prolonged outage of the Estlink 2 high-voltage direct current (HVDC) submarine power cable connecting Finland and Estonia. The incident occurred on September 17, 2024, and resulted in the complete disconnection of the 650 MW interconnector, significantly reducing electricity transmission capacity between the Finnish and Baltic power grids.
Background
Estlink 2 is a 170-kilometer (106 mi) bipolar HVDC cable link commissioned in 2014, owned by the Finnish transmission system operator (TSO) Fingrid and the Estonian TSO Elering. Together with Estlink 1 (350 MW), it forms a critical infrastructure component for the integration of the Baltic states into the European electricity network and for regional energy security, particularly following the Baltic states' desynchronization from the Russian IPS/UPS grid (planned for February 2025).
Timeline of Events
- September 17, 2024 (approx. 13:00 EEST): Fingrid and Elering reported a sudden fault on the Estlink 2 connection. The cable tripped offline automatically. Initial communications indicated a technical fault on the subsea cable section in the Gulf of Finland.
- September 18–20, 2024: Both TSOs confirmed that the fault was located in the submarine cable section, not in the converter stations (located in Anttila, Finland, and Püssi, Estonia). Repair vessels were mobilized to locate the exact fault position.
- Late September 2024: The fault location was identified. Investigations began into the cause of the damage. Early assessments ruled out internal component failure, pointing toward external mechanical damage.
- October 2024: Finnish and Estonian authorities, including the Finnish National Bureau of Investigation (KRP) and the Estonian Internal Security Service (KAPO), opened preliminary investigations into potential aggravated criminal damage and interference with critical infrastructure.
- November 2024: Reports emerged linking the damage to the Chinese-flagged vessel Newnew Polar Bear (or similar vessels in the vicinity at the time), drawing parallels to the 2023 Balticconnector pipeline incident. Authorities did not officially confirm the specific vessel responsible by the end of 2024, stating investigations were ongoing.
- December 2024 / Early 2025: Repair operations commenced. The outage was expected to last several months, with initial estimates targeting a return to service in mid-to-late 2025.
Impact
- Transmission Capacity: The loss of Estlink 2 reduced total Finland-Estonia interconnection capacity from 1,000 MW to 350 MW (Estlink 1 only).
- Market Effects: The outage contributed to price divergence between the Finnish and Baltic bidding zones on the Nord Pool power exchange, generally leading to higher prices in the Baltics and lower prices in Finland during peak hours due to constrained import/export capabilities.
- Energy Security: The incident heightened concerns regarding the physical security of subsea critical infrastructure in the Baltic Sea, occurring in the context of the upcoming "Baltic Synchronization" project (desynchronization from the Russian grid and connection to Continental Europe via Poland).
Investigations
As of early 2025, the official cause of the cable fault remained under investigation by Finnish and Estonian law enforcement and safety authorities. The leading hypothesis presented by investigators and government officials was external mechanical force, likely caused by a ship's anchor dragging along the seabed. The Finnish National Bureau of Investigation (KRP) classified the case as suspected aggravated criminal damage and interference with critical infrastructure.
Repair and Restoration
The repair process involves retrieving the damaged cable sections from the seabed (depths approx. 80–90 meters), splicing in new cable segments, and re-laying the line. This is a complex marine operation dependent on weather windows and specialized vessel availability. Fingrid and Elering stated the cable would remain offline until repairs are completed and commissioning tests passed.