106th Street station (Second Avenue Subway)

The 106th Street station is a planned station along the IND Second Avenue Line of the New York City Subway. It would be located at the intersection of Second Avenue and 106th Street in East Harlem, Manhattan, New York City, United States. Proposed since 1968, the station is expected to be built as part of Phase 2 of the Second Avenue Subway. When opened, it will initially be served by the Q train, with the T train providing service when Phase 3 of the line is built.

Location and Design

The station is planned to be an underground facility with two tracks and one island platform, located approximately 52 feet (16 m) below the surface. Under current plans, the station would have two exits: one at the northeast corner of 106th Street and Second Avenue, and another at the northeast corner of 108th Street and Second Avenue. The station's planned address is East 106th Street & Second Avenue, in the East Harlem neighborhood of Manhattan.

History

Background

The Second Avenue Line was originally proposed in 1919 as part of a massive expansion of what would become the Independent Subway System (IND). Work on the line never commenced, as the Great Depression disrupted the economy. Numerous plans for the Second Avenue Subway appeared throughout the 20th century, but these were usually deferred due to lack of funds. In anticipation of the never-built new subway line, the Second and Third Avenue elevated lines were demolished in 1942 and 1955, respectively. The Second Avenue Elevated had a station at 105th Street, and the Third Avenue Elevated had a stop on nearby Third Avenue at 106th Street.

Unrealized Proposals

The Metropolitan Transportation Authority (MTA) proposed a full-length Second Avenue Subway as part of its 1968 Program for Action. The line was to be built in two phases—the first phase from 126th to 34th Streets, and the second phase from 34th to Whitehall Streets. A station at 106th Street was included in these plans. Johnson & Hanchard received a contract for the design of the 106th Street station.

A groundbreaking ceremony was held on October 27, 1972, at Second Avenue and 103rd Street. Construction began on the 99th–105th Streets segment, projected to cost $17.48 million. However, due to the city's fiscal crisis in the mid-1970s, construction on the line stopped in September 1975, and the tunnels were sealed. The MTA regularly inspected and maintained the tunnel segments over the following decades.

In 1999, the Regional Plan Association recommended building a full-length Second Avenue Subway, which would include 106th Street as one of its planned 31 stations.

Current Construction

In March 2007, plans for the construction of the Second Avenue Subway were revived. Phase 1, which included three stations and cost approximately $4.45 to $4.5 billion, opened on January 1, 2017, with the line's northern terminal at 96th Street.

Phase 2, between 125th and 96th Streets, was allocated $525 million in the MTA's 2015–2019 Capital Plan for planning, design, environmental studies, and utility relocation. This phase will complete the project's East Harlem section. The alignment will run under Second Avenue to 124th Street, before turning west on 125th Street.

In July 2018, the MTA released a supplemental environmental assessment for Phase 2. The updated report indicated that the 106th Street station would be relocated about 5 to 6 feet (1.5 to 1.8 m) east and 50 feet (15 m) south compared to what had been proposed in the 2004 Final Environmental Impact Statement, in order to circumvent existing infrastructure under Second Avenue. The station would also include extra elevators in compliance with the Americans with Disabilities Act of 1990, with elevators at two entrances.

Land acquisition for Phase 2 started in April 2022. In June 2026, Skanska, Traylor and Walsh received a $1.02 billion contract for the 106th Street station's excavation. The contract, the third of four large contracts to be awarded for Phase 2, includes the 106th Street station shell, along with connections to the existing tunnels north and south of the station.

Service

When the station opens, it is expected to be served by the Q train. The T train is planned to provide service when Phase 3 of the Second Avenue Line is built. The station's next stop to the north would be 116th Street, and the next stop to the south would be 96th Street, both of which are future stations.